Certified TestStand Developer Exam Prep
Free practice questions

Free CTD Practice Questions

10 exam-style questions with answers and explanations, straight from our 1,030-question bank. Tap an answer to check yourself. When you're ready, take the scored version in the free practice test.

Start the free practice test → ★★★★★4.9/5 from 2,400+ candidates · No signup

These 10 free CTD questions are organized by exam domain, so you can see how each part of the Certified TestStand Developer blueprint is tested. Reveal the answer and explanation under each question.

Domain 1: Call LabVIEW code modules

Question 1

A relay check uses a Pass/Fail Test step. Its LabVIEW VI returns contactClosed=False and an error cluster with status=False and code=12. The outputs are mapped to Step.Result.PassFail and Step.Result.Error, and the pass/fail data source is Step.Result.PassFail. No later expression or callback changes the result. The station rejects Failed units and continues testing, but pauses on Error. What should happen after this check?

Show answer & explanation

Correct answer: D - Record Failed, reject this unit, and continue the production loop.

Domain 2: Pass custom data types to and from code modules

Question 2

A LabVIEW cluster element has been relabeled from Settle Time to Stabilization Time without changing its numeric type or meaning. Its TestStand custom type contains SettleTimeMs, a Number property used by several sequences. Cluster passing is enabled and the VI prototype has been refreshed, but the custom type still maps SettleTimeMs to Settle Time. The existing sequence expressions must remain valid. What needs updating?

Show answer & explanation

Correct answer: B - Change SettleTimeMs's Cluster Item Label to Stabilization Time; retain the property name.

Domain 5: Override and use model callbacks

Question 3

Under the Sequential model's Test UUTs entry point, StationCallbacks.seq supplies PreUUT serial-number capture for every product. Only Receiver.seq needs fixture calibration once per execution. A developer puts calibration in a client PreUUT override in Receiver.seq. Calibration now repeats for every unit, and serial-number capture disappears. Restore the intended behavior by selecting the appropriate change.

Show answer & explanation

Correct answer: C - Move calibration to a ProcessSetup callback in Receiver.seq and remove its PreUUT override.

Domain 7: Create a clutter free report with the proper result data

Question 4

An operator's HTML report must show Failed and Error steps, while the production database must retain all measurements, including passing ones. A developer disables result recording on the passing steps. Those tests still execute, but their measurements disappear from the database as well. The database processor is configured to log every collected measurement. Choose the configuration that satisfies both output requirements.

Show answer & explanation

Correct answer: B - Record all measurements; filter HTML with (Result.Status == "Failed") || (Result.Status == "Error").

Domain 9: Proper use of Parameters

Question 5

Sessions S and T are separate objects, both initially having OutputEnabled=True. A caller holds an Object Reference to S and passes it by value to a subsequence in the same execution. Through its parameter, the subsequence sets S.OutputEnabled to False. It then replaces that parameter's reference with a reference to T. Both sessions remain open. After the call, which object and state does the caller's original reference expose?

Show answer & explanation

Correct answer: D - Session S, with OutputEnabled=False.

Domain 11: Proper use of FileGlobal Variables

Question 6

One TestStand execution runs MeasureSocket in several concurrent threads from the same sequence file. Each invocation writes its socket's correction to FileGlobals.ActiveCorrection, then passes that property's value to its measurement VI. Separate File Globals for Each Execution is selected. Measurements must overlap without exchanging socket corrections. Which design provides the necessary isolation?

Show answer & explanation

Correct answer: A - Store each correction in an invocation Local and pass it to the measurement VI.

Domain 12: Proper use of 2 or more different test step types (e.g. Pass/Fail, Numeric, String, etc…)

Question 7

A current-measurement VI returns 1018 mA into Locals.CurrentmA without an error. A Numeric Limit Test uses that local as its data source, has inclusive limits of 0.95 and 1.10 amperes, and displays A in its Units field. The step reports Failed. How should the developer resolve this result while retaining the specified ampere limits?

Show answer & explanation

Correct answer: B - Compare Locals.CurrentmA / 1000 with the limits; the reading passes.

Domain 14: Proper use of Step Groups

Question 8

During a fixture fault, an independent interlock has already removed output power. Setup opened an instrument session before a later identification VI returned a runtime error. The station's On Run-Time Error setting is Run Cleanup. All VIs return control, and no callback or abort request changes execution. Software must attempt both OutputOff and CloseSession, even if OutputOff reports an error. How should these operations be arranged?

Show answer & explanation

Correct answer: C - Use separate Cleanup steps for both operations, guarded by successful session acquisition.

Domain 19: Debug broken/error sequences

Question 9

A command step is followed by a receive step. The device retains its reply for 200 ms, then discards it permanently. Transactions succeed during normal execution. During debugging, tracing is enabled and Engine.StationOptions.UIMessageDelay is set to 1000; every receive now times out despite confirmation that the command was sent. There are no breakpoints. Which next action most directly distinguishes a device fault from an effect of debugging?

Show answer & explanation

Correct answer: A - Set the trace delay to 0 and repeat the transaction with diagnostic messages retained.

Domain 20: Execute simple code modules in parallel

Question 10

A cycle has 4 s of setup, followed by two instrument self-tests launched together in separate TestStand threads. They take 22 s and 14 s and share no data or hardware. Finalization takes 6 s and may begin only after both workers finish. Launch, scheduling, and join overhead are negligible. The DUT must be released within 36 s of starting setup. Which timing assessment and completion strategy are correct?

Show answer & explanation

Correct answer: A - Release at 32 s: wait for both threads, then finalize; the deadline is met.

The rest of the CTD blueprint

The CTD exam also covers these domains. Drill them in the full free practice test:

That's 10 of 1,030

The full bank has 1,020 more CTD questions with explanations.

Continue in the free practice test →

View plans